Selamat Datang di
Kayenergi

Anggota Gratis
Kayenergi
Kayenergi
Share
Info Perusahaan
Rata-rata Tinjauan PemakaiTidak ada ulasan untuk perusahaan ini - Menulis tinjauan
Tanggal Bergabung:27 Oct. 2007
Terakhir Diperbarui:25 Mar. 2008
Korespondensi Perusahaan
Nama:Tn. Eko Nilo [Pemasaran]
E-mail:Kirim Pesan
Nomer HP:+6285281994438
Nomer Telpon:+6285281994438
Nomer Faks:+6251261409
Alamat:Jalan Jamrud no.07 - Sungai Danau - Satui
Tanah Bumbu, Kalimantan Selatan
Indonesia
Sifat Dasar Usaha:Pabrikan, Dagang, Jasa dari kategori Enerji

Penjelasan Ringkas

STEAM COAL 5500 Kcal/ Kg Reject 5300 Kcal/ Kg ( Crushed) - Rp 220, 000, -
STEAM COAL 5500 Kcal/ Kg Reject 5300 Kcal/ Kg ( ROM) - Rp 205, 000, -

STEAM COAL 5800 Kcal/ Kg Reject 5600 Kcal/ Kg ( Crushed) - Rp 300, 000, -
STEAM COAL 5800 Kcal/ Kg Reject 5600 Kcal/ Kg ( ROM) - Rp 285, 000, -

Coal Spesification
GCV : 5.717 Kcal/ Kg ( adb)
Total Moisture : 26, 01 % ( ar)
Inherent Moisture : 16 % ( adb)
Ash : 3.5 % ( adb)
Volatile Matter : 39 % ( adb)
Fixed Carbon : 40 % ( adb)
Total Sulphur : 0.98 % ( adb)
HGI : 45
Mining Site
Location : The Mining area is located in Desa Jombang, Regency of Tanah Bumbu in South
Kalimantan Province. The Mining Concession name is KP Erlianti Permata Top
Indonesia ( by H.Jahrian) . with the original concession area 199 hectare ( extension
area until 394, 30 hectare) .
Mining Permitt : Exploration
Name : KP Erlianti Permata Top Indonesia
No. : 540 / 77 / KP / D.PE
Date : November 20, 2007
Code : TB.04 DESPR 155
Area : 394, 30 hectare
Explotation :
Name : KP Erlianti Permata Top Indonesia
No. : 545 / 177-EX / KP / D.PE
Date : November 20, 2007
Code : TB.04 DESPR 155
Area : 199, 10 hectare
Hauling Road
Distance : 18 km to barge loading ( port KGS 2)
Wide : 12 meter
Construction : Agragate
Coal Hauling
System : Trucking
Capacity : 10 – 20 tons
Travel Speed Empty : 50 km/ hour
Travel Speed Loaded : 30 km/ hour
Loading Time : 0.19 hours
Unloading Time : 0.11 hours
Working Hour Effective : 16 hours per day ( 2shift)
Coal Prosessing
ROM Stockpile Capacity : 60, 000 mt
Crushing Capacity : 500 mt per hour
Crush Coal Stockpile Cap : 50, 000 mt
Coal Transhipment / Barge Loading Port
Port of Loading : Satui, Regency of Tanah Bumbu, South Kalimantan, Indonesia
Name of Port : BAC ( Bahari Alam Ceria ) - APTS
Loading System : Ramp Door Trucking Lossing + Conveyor
Loading Rate : 6, 000 - 8, 000 MT per day
Barges Capacity : 300 feet ( 8000mt)
System : Tug Barge
Distance : 10 miles to Muara Satui Anchorage ( open sea)
Min Order Per Barge : 5, 500 MT
Min Order Per Shipment : 30, 000 MT
Max Supply : to be confirmed for each serious enquiries.
Delivery Schedule : At Buyer Option but to be Confirmed by Seller
Site Visit : Can be arranged at buyer cost for contract signing and mine site visit
Inspection : Equivalent at Seller’ s cost during loading port
Origin : Indonesia
Packaging : Bulk
Payment System
Term : please contact us for more detail information
Incoterms Term : F.O.B - Barge ( NO CIF or CNF)

Ingin menghubungi perusahaan ini?
Kirim Pesan  
Permintaan Anda akan disimpan di "Surat Bisnis".




Membuat situs langsung jadi?
Silahkan Klik disini!