Back to Top

Hi, Guest!

Kayenergi

  LOKASI :  Kabupaten Tanah Bumbu

Bergabung Selama :

BAGIKAN :   

Bagikan :
Kelompok Produk X

Katalog Produk

BEST DEAL

Hasil tidak ditemukan

  •     dari   0   halaman
  •    
PROFIL PERUSAHAAN
Kayenergi
Jalan Jamrud no.07 - Sungai Danau - Satui
STEAM COAL 5500 Kcal/Kg Reject 5300 Kcal/Kg (Crushed) - Rp 220,000,- STEAM COAL 5500 Kcal/Kg Reject 5300 Kcal/Kg (ROM) - Rp 205,000,- STEAM COAL 5800 Kcal/Kg Reject 5600 Kcal/Kg (Crushed) - Rp 300,000,- STEAM COAL 5800 Kcal/Kg Reject 5600 Kcal/Kg (ROM) - Rp 285,000,- Coal Spesification GCV : 5.717 Kcal/Kg (adb) Total Moisture : 26,01 % (ar) Inherent Moisture : 16 % (adb) Ash : 3.5 % (adb) Volatile Matter : 39 % (adb) Fixed Carbon : 40 % (adb) Total Sulphur : 0.98 % (adb) HGI : 45 Mining Site Location : The Mining area is located in Desa Jombang, Regency of Tanah Bumbu in South Kalimantan Province. The Mining Concession name is KP Erlianti Permata Top Indonesia (by H.Jahrian). with the original concession area 199 hectare (extension area until 394,30 hectare). Mining Permitt : Exploration Name : KP Erlianti Permata Top Indonesia No. : 540 / 77 / KP / D.PE Date : November 20, 2007 Code : TB.04 DESPR 155 Area : 394,30 hectare Explotation : Name : KP Erlianti Permata Top Indonesia No. : 545 / 177-EX / KP / D.PE Date : November 20, 2007 Code : TB.04 DESPR 155 Area : 199,10 hectare Hauling Road Distance : 18 km to barge loading (port KGS 2) Wide : 12 meter Construction : Agragate Coal Hauling System : Trucking Capacity : 10 – 20 tons Travel Speed Empty : 50 km/hour Travel Speed Loaded : 30 km/hour Loading Time : 0.19 hours Unloading Time : 0.11 hours Working Hour Effective : 16 hours per day (2shift) Coal Prosessing ROM Stockpile Capacity : 60,000 mt Crushing Capacity : 500 mt per hour Crush Coal Stockpile Cap : 50,000 mt Coal Transhipment / Barge Loading Port Port of Loading : Satui, Regency of Tanah Bumbu, South Kalimantan, Indonesia Name of Port : BAC ( Bahari Alam Ceria ) - APTS Loading System : Ramp Door Trucking Lossing + Conveyor Loading Rate : 6,000 - 8,000 MT per day Barges Capacity : 300 feet (8000mt) System : Tug Barge Distance : 10 miles to Muara Satui Anchorage (open sea) Min Order Per Barge : 5,500 MT Min Order Per Shipment : 30,000 MT Max Supply : to be confirmed for each serious enquiries. Delivery Schedule : At Buyer Option but to be Confirmed by Seller Site Visit : Can be arranged at buyer cost for contract signing and mine site visit Inspection : Equivalent at Seller’s cost during loading port Origin : Indonesia Packaging : Bulk Payment System Term : please contact us for more detail information Incoterms Term : F.O.B - Barge (NO CIF or CNF)